Events Calendar
| S | M | T | W | T | F | S |
|---|---|---|---|---|---|---|
1 | 4 | 6 | 7 | |||
8 | 13 | 14 | ||||
18 | 20 | |||||
22 | 23 | 25 | 27 | 28 | ||
Board President Michael Parrie reached out to the 48th Ward Alderwoman’s Office with some suggestions that came up.
Specifically he asked if it could be recommended that the CTA ask for the 92 bus to be go further up north to Bryn Mawr, like it did during the recent construction effort, instead of going only up to Berwyn?
Also, he requested consideration that Sheridan Road be paved from Irving Park Road to Bryn Mawr, due to uneven spots and holes.
The Alderwoman’s Chief of Staff Nicole Granacki responded:
“Thank you for reaching out with these important matters.
We are aware of the rough condition of Sheridan Road south of Bryn Mawr and are working on having it resurfaced as soon as possible. The Department of Water Management will be tearing up Sheridan Road in Summer 2026 for a critical infrastructure project, and as soon as their work is done, CDOT will come in with resurfacing. In the meantime, please continue to report potholes in 311 and we’ll continue to have them filled.
I have noted your suggestion about the CTA bus and will share it with CTA and the Alderwoman. Please also consider sending your feedback directly to CTA: CTA Feedback Form.”
Online we identified some additional resources:
Key Information:
For CTA feedback and suggestions, the “Feedback Form” link appears to be the best route (no pun intended).